22
i
i
D
OMESTIC
F
LOOR
I
NSTALLATION
2451072
2m Length
15
Code
Dimensions m
UNITS/
pack.
EURO/m
KILMA-THERM
superfluidifying additive.
Superfluidifying liquid additive
for foundations in CLS.
Improves processability
and performance.
Electro-welded wire
binding mesh
for foundations.
Wire mesh panels with
electro-welded zinc-plated wire
to prevent cracking in
CLS foundations.
Overlap: 75 mm and minimum gap.
Wire mesh: 75 x 75 mm.
Dimensions: 991x2060 mm.
Wire diameter: 2 mm.
Recommended dosing:
0.5 ÷ 1.5 l per 100 Kg. of CLS.
2132842
10 (8 litres)
1
2106293
25 (21 litres)
1
Code
Tank kg
UNITS/
pack.
EURO/Kg
Ï
Supplied in bundles of 20 panels.
Ï
Binding function
for CLS foundations.
Ï
Polypropilenic Fibre.
Fibre for CLS foundations.
Improves the elasticity and
resistance of foundations,
eliminating the risk of cracks
in inadequately seasoned screeds.
Non inflammable product
Art. 2-Dir. 67/458/EEC.
Excellent resistance to the acids,
bases and chemical agents
present in concrete mixes.
Supplied in biodegradable
bags (1 kg/product).
3857482
1
5
1
Code
Packing/kg
UNITS/
pack.
EURO/Kg.
2134525
40,8
1
Code
Bundle m
2
UNITS/
pack.
EURO/m
2
Cold Form Bend.
·This cold form bend is used at
floor level to make the turn up to
the manifold as tidy as possible
·It is compatible with pipe of sizes
16mm and 17mm.
·If provides a stable and defined
way of fixing the pipe below the
manifold
·They can also provide support in
areas of tight bend radii
3690741
17mm Cold Form Bend
1
Code
Description
UNITS/
pack.
EURO/pc
Conduit.
Designed to be used also
as pipe protection near
the manifold.
i
Dosing for medium concrete mixtures: 0.9 kg/1m
3
per
foundation.
Ï
To restore processability
(CLS treated with additive in fibre),
use KILMA-THERM 0,5-0.7 l/100kg CLS.
Ï
1 Mtr Aluminium Heat Panel
Double.
· Double heat panels - Used to
spread the heat evenly across an
entire floor area
· Aluminium panels for laying on
wooden suspended, sprung tim-
ber, battened or floating floors
· When the floor to be heated is
covered by the panel's pipe can
then be installed in the pre-
designed centres of 200mm
apart.
· They are fixed to the underside of the floor
using staples or screws
· When the plates and pipework have been
installed, insulation is placed in the void below
the plates to minimise downward heat loss
· Panels can be cut to fit where necessary
2561705
1 Mtr
1
Code
Description
UNITS/
pack.
EURO
Profile for joint foundation.
Adhesive profile to hold
the perimetral joint when used
as foundation expansion joint.
Code
Description
UNITS/
pack.
EURO/m
2996196
1/2" Conduit 100M Coil
1
3979886
3/4" Conduit 50M Coil
1
1484903
1" Conduit 50M Coil
1