8
C
OMMERCIAL
F
LOOR
I
NSTALLATION
Commercial Floor Installation
When the installation lays on
a particularly wet site or high water table,
the following installation methods are
recommended:
· 1 - Kilma-Piano or Kilma-Therm insulating
panel to fix the pipes using clips and/or clamps.
· 2 - Kilma-Piano or Kilma-therm insulating
panels, and tracking to fix the pipe.
When the installation lays on a dry surface
with low moisture levels, the following
installation methods are recommended:
· 3 - Plastic sheeting as humidity barrier,
electro-welded wire mesh to fix piping with
clips or clamps.
· 4 - Plastic sheeting as humidity barrier,
tracking to fix the pipe.
1
3
2
4
100 mm
1
3
0
m
m
30 mm
Flooring
Perimetric joint
Level foundation
Additive foundation
Electro-welded wire mesh
Ø 6-10 mm, structural
"PE-Xc" pipe
Ø 20x2 mm
25x2.3 mm
Insulating panel
Kilma-Piano
100 mm
1
3
0
m
m
30 mm
Clips
Skirting-board
Perimetric joint
1
0
0
-
2
0
0
m
m
Perimetric joint
1
2
3
4
Track to fix the pipe
Perimetric joint
Level foundation
Additive foundation
Electro-welded wire mesh
Ø 6-10 mm, structural
"PE-Xc" pipe
Ø 20x2 mm
25x 2.3 mm
Insulating panel
Kilma-Piano
Clips
Flooring
Level foundation
Additive foundation
Electro-welded net base
Ø 3-6 mm, fixed with clips
"PE-Xc" pipe
Ø 20x2 mm
25x2.3 mm
Electro-welded net base
Ø 3-6 mm, fixed with clips
Electro-welded wire mesh
Ø 6-10 mm, structural
Clips
PE sheet
Humidity barrier
pipe "PE-Xc"
Ø 20x2 mm
25x2,3 mm
Electro-welded wire mesh
Ø 6-10 mm, structural
PE sheet
Humidity barrier
Level foundation
Track to fix the pipe
Additive foundation
1
0
0
-
2
0
0
m
m