Figure 5.1 Option 1 – Airport Layout Plan in 2030 5 OPTION 1: TWORUNWAY SYSTEM (a) Passenger terminal expansion (HK$6.9 billion) • expand Terminal 1’s gross floor area by 14%, or 82,000 square metres, to provide additional space required for more check-in counters and roadside kerb at departure level, baggage reclaim carousels at arrival level, immigration/customs/ security processing facilities and more room in general for circulation and amenities • increase check-in counters at Terminal 2 from the existing 56 to 112 (b) Apron and passenger concourse expansion (HK$8.3 billion) • expand the Midfield concourse, including the addition of a second I-shaped passenger concourse • add another 20 remote stands for freighters and another 20 airbridge-served passenger aircraft stands at the Midfield (c) Automated People Mover (APM) extension (HK$2.3 billion) • extend the APM system to reach the new second “I-shaped” passenger concourse at the Midfield (d) Baggage Handling System (BHS) enhancement (HK$2.1 billion) • develop additional baggage make-up laterals and reclaim carousels within the expanded footprint of Terminal 1 • develop a new high-speed baggage system for the Midfield passenger concourses HKIA MASTER PLAN 2030 29