General
Make sure that electrical and sanitary pipes duct ways in the thermal envelope are airtight and insulated
Use energy efficient appliances and equipment

The work in progress
Schedule inspections in the course of the building process
Check construction details, while it is possible e.g. that the insulation is placed continuously and thermal
bridging prevented
Check that duct ways (through the vapour barrier) are correctly installed and sealed
Get a Blower­ Door test done to ensure airtightness of the building
Make sure that the regulation of the ventilation is done, adjust the air supply and extraction and measure
the electricity consumption
Check that the pipes are insulated

For the complete design guideline, see deliverable 21
3.2. Single family houses
The design, construction and monitoring of low-energy single family houses in Stenløse Syd was carried out
and the following are two examples of the results.
3.2.1. KILDEBÆKKEN 2
Figure 14. Overview photo of Kildebækken

Design and Construction

Kildebækken 2 is a single-family house of 221.7m2 constructed in March 2011 by the construction company
"2 Plan Huset". It is occupied by 2 adults and 2 children. Bellow in Figure 15 is the distribution of the floor
plan of 221.7 m2, with two bathrooms porch and two parking, is shown.